1049 Dunlap|Rehab Case Study

1049 Dunlap|Rehab Case Study

This is a duplex with 2 beds on one side and 1 bed on the other side. This is a full rehab, total Gut Out, Re-wire, flooring and roofing.  Demo team is now in first phase of gut out and will continue until all plaster is off wall and all floors are pulled out.

This property is going to be great for two single families that are coming from our non-profit partners.

 

 

 

 

Phase One 03/05/2019 – 6/05/2019 Demo, Rotten Wood, And Clean Out

 

https://www.googletagmanager.com/gtag/js?id=AW-860676620 https://www.googletagmanager.com/gtag/js?id=GA_TRACKING_ID